Polymast - Fabrica de Mastros para BandeirasWe are looking for distributors

Assembly Guide

  • Start by digging a hole down to the depth indicated below.
  • Prepare the anchor rods (A) according to the sketch (1.) and please note that the thin nuts (B) must be 7Omm from the top end of the anchor rods (B).
  • Fill the hole with concrete all the way up to ground level. Please make sure that the base plate (C) is in level by using a water-level. Place the base plate (C) so that the hinge function is in the right position. Please verify no obstacles are in the way to erect the flagpoles.
  • When the concrete is dry, screw the long nuts (E) and the washers (F), used to control the leveling of the flagpoles, to the anchor rods (A). Attach the pole base(G) to the base plate (C) using the long screw (D) so the flagpole can be erected using the hinch systhem.
  • When the flagpole is lying on the ground please assemble finial (H) as in sketch (2.), cleat (I) and halyard (J) (STD Systhem), or banner bar Kit (K) onto the flagpole.
  • Erect the flagpole. Screw the last nuts and washers to the anchor rods and adjust the vertical position by using the lower nuts(E). Put the nuts tightly.
montajem montajem

Installation in the GROUND.
montajem

Instalation in concrete blocks ABOVE GROUNDLEVEL
montajem

ImprimirPrint assembly instructions

Fiberglass Flagpoles for Flags, Color Flagpoles for Flags, Flagpole Accessories...
Polymast guarantees its customers a good corporate image

Polymast | +00(34) 986 625 010 | 00(351) 912 518 390 | www.flagpolespolymast.com | E-Mail: comercial@flagpolespolymast.com